Product Center

1000+ specifications and models to meet various electrical engineering needs

Together12product
Cable Joint Protection Box
Lead Time: 7-15 days
Cable Accessories

Cable Joint Protection Box

Excellent corrosion resistance, superior sealing and thermal conductivity. Designed to protect cable splices, preventing breakdowns and explosions.
Request a QuoteView details
Busbar Box (Custom)
Lead Time: 7-15 days
Cable Accessories

Busbar Box (Custom)

Provides insulation and sealing for busbar connections to prevent condensation and corrosion, enhancing switchgear safety while simplifying installation and maintenance.
Request a QuoteView details
Heat-Shrinkable Cable Accessory 1-3 5KV
Lead Time: 7-15 days
Cable Accessories

Heat-shrinkable cable accessory 1-3 5KV

Heat-shrinkable cable accessories for voltage ratings of 1-35kV, with stable insulation and protection performance.
Request a QuoteView details
Cold Shrink Cable Accessory 1-3 5KV
Lead Time: 7-15 days
Cable Accessories

Cold-shrink Cable Accessory 1-3 5kV

Cold-shrink cable accessories for 1-35kV systems; easy to install with reliable sealing.
Request a QuoteView details
US/EU Plug 12/2 4KV
Lead Time: 7-15 days
Cable Accessories

US/EU Plug 12/2 4KV

US/EU removable connector plug, rated for 12/2 4kV; fully insulated and sealed design
Request a QuoteView details
SVG Static Var Generator
Lead Time: 7-15 days
Smart Capacitor Reactor

SVG Static Var Generator

Dynamic reactive power compensation device with millisecond-level response to improve power factor and power quality.
Request a QuoteView details
1kV High-Voltage Instrument Transformer
Lead Time: 7-15 days
High-voltage instrument transformer

1kV High-Voltage Current Transformer

1kV Voltage/Current Transformer, Epoxy-Resin Cast Insulation, for Metering and Protection
Request a QuoteView details
Smart Capacitor
Lead Time: 7-15 days
Smart Capacitor Reactor

Smart Capacitor

Smart integrated power capacitor with automatic switching compensation and maintenance-free design
Request a QuoteView details
24KV High-Voltage Instrument Transformer
Lead Time: 7-15 days
High-voltage instrument transformer

24KV High-Voltage Current Transformer

2 4KV Voltage/Current Transformer with fully enclosed insulation, designed for medium-voltage switchgear
Request a QuoteView details
reactor
Lead Time: 7-15 days
Smart Capacitor Reactor

Reactor

Series reactor: suppresses harmonics and switching surges; used with capacitors.
Request a QuoteView details
3 5kV High-Voltage Instrument Transformer
Lead Time: 7-15 days
High-voltage instrument transformer

35KV High-Voltage Instrument Transformer

35kV Voltage/Current Transformer, available for outdoor or indoor use, meeting high-voltage metering and protection requirements
Request a QuoteView details
Zero-sequence high-voltage current transformer
Lead Time: 7-15 days
High-voltage instrument transformer

Zero-sequence high-voltage current transformer

Zero-sequence current transformer for small-current grounding line selection and leakage protection circuits
Request a QuoteView details