Product Center

1000+ specifications and models to meet various electrical engineering needs

Together9product
High-voltage 15 switchgear XGN15-12
Lead time: 7-15 days
High-voltage complete sets

High-voltage 15 cabinet XGN15-12

10-3 5kV High-Voltage Switchgear, Suitable for Substations and Industrial/Commercial Power Distribution Systems; KYN28 Medium-Insertion Cabinet
Request a QuoteView Details
High-voltage 66 cabinet XGN66-12
Lead time: 7-15 days
High-voltage complete sets

High-voltage 66 switchgear XGN66-12

66kV High-Voltage Switchgear, Suitable for Power System Substations and GIS Assemblies
Request a QuoteView Details
Photovoltaic Grid-Connection Cabinet
Lead time: 7-15 days
Photovoltaic Cabinet

Photovoltaic Grid-Connected Cabinet

Grid-tied cabinet for photovoltaic power generation, supporting 380V–10kV grid connection. Includes inverter and grid switch.
Request a QuoteView Details
Power Box
Lead time: 7-15 days
Low-voltage switchgear

Power Box

Low-voltage power distribution cabinet, suitable for industrial and mining enterprises' power distribution, IP54 protection rating
Request a QuoteView Details
Cabinet-type Transformer / European-style Transformer
Lead time: 7-15 days
Box-type Substation / European-type Transformer

Box-type Substation / European-style Transformer

Modular substation: integrated high-voltage room, transformer room, and low-voltage room. Outdoor pre-assembled substation.
Request a QuoteView Details
Low-voltage switchgear GGD
In Stock, Custom
Low-voltage switchgear

Low-voltage switchgear GGD

Rated current: 630A - 6300A, rated voltage: 380V
Request a QuoteView Details
Medium-voltage 28 switchgear, KYN28-12
In Stock, Custom
High-voltage complete sets

High-voltage 28 switchgear, middle-mounted cabinet KYN28-12

Rated voltage: 12kV, rated current: 630A - 4000A
Request a QuoteView Details
MNS Drawer Cabinet
Lead time: 7-15 days
Low-voltage switchgear

MNS Drawer Cabinet

GCS/MNS Drawout Switchgear: Modular design for easy maintenance in low-voltage power distribution systems
Request a QuoteView Details
Prefabricated Cabin
Lead time: 7-15 days
Box-type Substation / European-type Transformer

Prefabricated Cabin

Prefabricated substation: factory-built for rapid on-site installation, ideal for renewable energy power plants.
Request a QuoteView Details